533 - Ramp Tapers.dgn |
10/21/2025 |
Transportation |
Road Design Details |
Construct subbase for ramp exit pavement the same thickness as mainline subbase. Construct subbase for ramp entrance pavement the same thickness as m... |
 |
113-10 - Sidewalk Compliance - Data should be imported into Design Tabulations for final use |
10/21/2025 |
Transportation |
Road Design Details |
Staking required by Contracting Authority per Article 2511.03 of the Standard Specifications. Refer to tabulation 113-01 for bid quantities. |
 |
108-22 - Pavement Marking Line Types |
10/21/2025 |
Transportation |
Road Design Details |
Line factors based on 6-inch wide continuous line. BCY4 - Place on the same side of the roadway to match existing markings near the project. No Pass... |
 |
560 - Miscellaneous.dgn |
10/21/2025 |
Transportation |
Road Design Details |
Mailbox turnouts shall be full shoulder width with a min- 4% Edge of Roadway Face of Mailbox Full Shoulder Width For multiple mailbox installations in... |
 |
533-02 - Parallel Acceleration Taper for 16' Ramp (60 MPH Design Speed) |
10/21/2025 |
Transportation |
Road Design Details |
TABLE OF SHOULDER TRANSITION LENGTHS WITH 6' SHOULDER ON RAMP. Shoulder Width beyond Edge of Mainline Pavement. NOTE: The algebraic difference betwe... |
 |
8000-00 - All 8000s.dgn |
10/21/2025 |
Transportation |
Road Design Details |
Possible Grade Bottom of Treatment Trench Subgrade Surface PROFILE VIEW TYPICAL DETAILS OF DRAIN FOR SUBGRADE TREATMENT TRENCH PLAN VIEW SECTION A-A A... |
 |
533-04 - Parallel Deceleration Taper for 24' Ramp (60 MPH Design Speed) |
10/21/2025 |
Transportation |
Road Design Details |
(12' wide) Refer to plans for length of deceleration lane. Li ne ' B' 1 Li ne ' C' 2 M Note: The algebraic difference between the profile grade for r... |
 |
100 - Design Tabulations.xlsm |
10/21/2025 |
Transportation |
Road Design Details |
Columns N:S don't need to be imported into Design Tabulations. If you do, Columns "O" and "S" will give errors if slope values are not converted to d... |
 |
7156 - Paved Shoulder at Guardrail (Granular Shoulder Adjacent to Mainline) |
10/21/2025 |
Transportation |
Road Design Details |
" PCC may be substituted with the following jointing layout: Match mainline pavement joint spacing. When mainline pavement is 8" or greater in thickn... |
 |
500-00 - All 500s |
10/21/2025 |
Transportation |
Road Design Details |
Contract item "Small Animal Barrier" includes chain link fence fabric, galvanized tie wires, 12 inch trench excavation, backfill and compaction around... |
 |
7157 - Paved Shoulder at Guardrail (Adjacent to Partial Width Paved Shoulder) |
10/21/2025 |
Transportation |
Road Design Details |
Edge of Granular Shoulder Edge of Shoulder Pavement. When mainline pavement is 8" or greater in thickness, place additional transverse 'C' joints in ... |
 |
533-01 - Parallel Deceleration Taper for 16' Ramp (60 MPH Design Speed) |
10/21/2025 |
Transportation |
Road Design Details |
Note: The algebraic difference between the profile grade for ramp base line at M and realtive profile grade of mainline at C is 0.20% PROFILE. C Edge... |
 |
Index |
10/21/2025 |
Transportation |
Road Design Details |
NO. DATE TITLE 100-0A 10-28-97 Estimated Roadway Quantities (1 Division Project) 100-1A 09-20-22 Estimated Project Quantities 100-1C 04-17-12 Estimate... |
 |
533-03 - Parallel Deceleration Taper for 18' Ramp (60 MPH Design Speed) |
10/21/2025 |
Transportation |
Road Design Details |
Shoulder Width beyond Edge of Mainline Pavement. NOTE: W is the width of the outside lane to the Edge of Pavement. Construct Loop exit pavement the ... |
 |
8250 - Pier Protection Reinforced Paved Shoulder |
10/21/2025 |
Transportation |
Road Design Details |
Possible Contract Item: Reinforced Paved Shoulder for Concrete Barrier Possible Tabulation: 108-18B Sheet 1 of 5 PIER PROTECTION REINFORCED PAVED SHOU... |
 |
533-05 - Parallel Acceleration Taper for 24' Ramp (60 MPH Design Speed) |
10/21/2025 |
Transportation |
Road Design Details |
(24' wide) Refer to plans for length of acceleration lane. NOTE: The algebraic difference between ramp profile grade at point F and relative profile ... |
 |
7000-00 - All 7000s.dgn |
10/21/2025 |
Transportation |
Road Design Details |
AGGREGATE FOR PAVED SHOULDER FILLET 2 Match slope of under side of shoulder pavement. HMA or PCC Paved Shoulder EARTH FOR PAVED SHOULDER FILLET 2 Mat... |
 |
8000-00 - All 8000s |
10/21/2025 |
Transportation |
Road Design Details |
Concrete Barrier with MSE Wall 04-16-24 Temporary Concrete Barrier Layout for One-Way Traffic 04-16-24 Temporary Concrete Barrier Layout for Two-Way T... |
 |
7000-00 - All 7000s |
10/21/2025 |
Transportation |
Road Design Details |
Typical Fillet Section for Type 'B' Granular Surfaced Shoulder (Adjacent to HMA Resurfacing) 10-15-13 Typical Section for Type 'B' Granular Shoulder (... |
 |
7158 - Paved Shoulder at Guardrail (Adjacent to Full Width Paved Shoulder) |
10/21/2025 |
Transportation |
Road Design Details |
" PCC may be substituted with the following jointing layout: Match mainline pavement joint spacing. When mainline pavement is 8" or greater in thickn... |
 |
2025-0023 Alexander Thomas Goodwin.pdf |
06/02/2025 |
Inspections, Appeals, and Licensing, Department of |
Board of Pharmacy |
March |
 |
ENG 24-021 Swachwa Dey - Order Granting License.docx |
05/30/2025 |
Inspections, Appeals, and Licensing, Department of |
Engineering and Land Surveying Board |
BEFORE THE IOWA ENGINEERING AND LAND SURVEYING EXAMINING BOARD. On March 31, 2025, the Iowa Engineering and Land Surveying Examining Board (Board) is... |
 |
IREC 24-139 North Order Rescheduling Hearing.pdf |
05/29/2025 |
Inspections, Appeals, and Licensing, Department of |
Real Estate Sales & Brokers |
ORDER RESCHEDULING HEARING AND PRE-HEARING CONFERENCE. Calling into the Hearing: At the date and time scheduled for hearing, you must do the followin... |
 |
ACC 24-32 Benita Holmes Combo.pdf |
05/28/2025 |
Inspections, Appeals, and Licensing, Department of |
Accountancy Examining Board |
Respondent is an Iowa licensed CPA working in Dubuque, Iowa during. Respondent is charged under Iowa Code section 542.6(2) and Iowa Administrative Co... |
 |
24-0109 Roggenbauer, Jamie SA FO.pdf |
05/27/2025 |
Inspections, Appeals, and Licensing, Department of |
Iowa Board of Social Work |
COMES NOW the Iowa Board of Behavioral Health Professionals ("Board") and Jamie Roggenbauer ("Respondent") and enter into this combined Statement of C... |
 |
23-0072 Tonelli Settlement.pdf |
05/27/2025 |
Inspections, Appeals, and Licensing, Department of |
Iowa Board of Behavioral Science |
Respondent’s Iowa mental health temporary license is active and will next expire on September 30, 2026. Respondent is an Iowa temporary licensed ment... |
 |
Sachau, Kelly Final Order--BS 21-0322, 23-0107, 24-0039 Combo.pdf |
05/27/2025 |
Inspections, Appeals, and Licensing, Department of |
Iowa Board of Behavioral Science |
Respondent is an Iowa licensed mental health counselor who practiced mental health counseling in Sioux City, Iowa, during the time period relevant to ... |
 |
10D-1 Sample - Form 1 for Industrial Facilities |
05/23/2025 |
Transportation |
Design Manual |
List all environmental permits or licenses from federal, state or local agencies required to operate this facility (e.g. RCRA, UIC, PSD, water use). ... |
 |
10D-1 Sample - Form 2F for Industrial Facilities |
05/23/2025 |
Transportation |
Design Manual |
A. For each outfall, provide an estimate of the area (include units) of impervious surfaces (including paved areas and building roofs) drained to the ... |
 |
2024-0034 Houck Pharmacy Combo.pdf |
05/22/2025 |
Inspections, Appeals, and Licensing, Department of |
Board of Pharmacy |
Respondent maintains Iowa pharmacy license number 751. Respondent’s Iowa pharmacy license is active and will next expire on December 31, 2024. Respo... |
 |